No-Idle Flow Shop Scheduling with Deteriorating Jobs and Common Due Date Under Dominating Machines.

Authors :
Lv, Dan-Yang
Wang, Ji-Bo
Source :
Asia-Pacific Journal of Operational Research; Dec2024, Vol. 41 Issue 6, p1-19, 19p
Publication Year :
2024

Abstract

The phenomenon of deterioration effects can reduce production efficiency caused by extended start time or other factors. Based on it, this paper considers the scheduling situations of the common due date assignment in a no-idle flow shop scheduling environment. Under the given four dominating relationships (i.e., increasing, decreasing, increasing-decreasing and decreasing-increasing dominating machines, correspondingly expressed as idm, ddm, idm–ddm and ddm–idm) between machines, the objective functions are, respectively, to minimize (1) the weighted sum of common due date and total earliness; and (2) the weighted sum of common due date, total earliness and total penalty factors of tardy jobs. It is verified that these problems can be solved in polynomial time under four dominating relationships. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
02175959
Volume :
41
Issue :
6
Database :
Complementary Index
Journal :
Asia-Pacific Journal of Operational Research
Publication Type :
Academic Journal
Accession number :
182123005
Full Text :
https://doi.org/10.1142/S0217595924500039