Back to Search Start Over

A Goal Programming Model for Rescheduling of Generation Power in Deregulated Markets.

Authors :
Centeno, E.
Vitoriano, B.
Campos, A.
Muñoz, A.
Villar, J.
Sánchez-Úbeda, E. F.
Source :
Annals of Operations Research; Apr2003, Vol. 120 Issue 1-4, p45-57, 13p, 2 Charts
Publication Year :
2003

Abstract

In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
02545330
Volume :
120
Issue :
1-4
Database :
Complementary Index
Journal :
Annals of Operations Research
Publication Type :
Academic Journal
Accession number :
18724034
Full Text :
https://doi.org/10.1023/A:1023366127386