Cite
Models for assessing hoisting times of tower cranes.
MLA
Leung, Arthur W. T., and C. M. Tam. “Models for Assessing Hoisting Times of Tower Cranes.” Journal of Construction Engineering & Management, vol. 125, no. 6, Nov. 1999, p. 385. EBSCOhost, https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(385).
APA
Leung, A. W. T., & Tam, C. M. (1999). Models for assessing hoisting times of tower cranes. Journal of Construction Engineering & Management, 125(6), 385. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(385)
Chicago
Leung, Arthur W.T., and C.M. Tam. 1999. “Models for Assessing Hoisting Times of Tower Cranes.” Journal of Construction Engineering & Management 125 (6): 385. doi:10.1061/(ASCE)0733-9364(1999)125:6(385).