Back to Search Start Over

On the feasibility of sequence-dependent economic lot scheduling problem.

Authors :
Shirodkar, Vinay A.
Madhusudanan Pillai, V.
Sridharan, R.
Source :
International Journal of Production Research; May2011, Vol. 49 Issue 10, p2925-2939, 15p, 6 Charts, 1 Graph
Publication Year :
2011

Abstract

In this paper, we develop a formulation for the economic lot scheduling problem (ELSP) wherein products with sequence-dependent setups are to be scheduled on a single facility to minimise the average sum of inventory holding and setup costs. We show that our formulation, based on the time varying lot size approach, always provides feasible schedules for any given sequence and is independent of the setups being sequence-independent or sequence-dependent. We compare our schedule with the schedule proposed by Dobson (1992) and reveal the infeasibility associated with Dobson's formulation. A numerical example evaluating schedules with both cases of setups: sequence-independent and sequence-dependent, demonstrates our assertion. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00207543
Volume :
49
Issue :
10
Database :
Complementary Index
Journal :
International Journal of Production Research
Publication Type :
Academic Journal
Accession number :
59165513
Full Text :
https://doi.org/10.1080/00207541003738899