An Estimate of Expected Critical--Path Length in PERT Networks.

Authors :
Lindsey II, J. H.
Source :
Operations Research; Jul/Aug72, Vol. 20 Issue 4, p800-812, 13p
Publication Year :
1972

Abstract

The estimate of expected critical-path length in PERT networks in this paper is usually better than the FULKERSON estimate because of greeter flexibility in choosing a path whose length approximates the length of the critical path. As the calculations are based on a model approximating the actual network, the new estimate may fall on either side of the expected critical path, even though the Fulkerson estimate never exceeded the expected critical-path length. A Fortran program was written to calculate the new estimate, whose calculation is more complicated than Fulkerson's estimate. The new estimate, Fulkerson's estimate, and the expected critical-path length are compared in several examples. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0030364X
Volume :
20
Issue :
4
Database :
Complementary Index
Journal :
Operations Research
Publication Type :
Academic Journal
Accession number :
8735130
Full Text :
https://doi.org/10.1287/opre.20.4.800