An Estimate of Expected Critical--Path Length in PERT Networks.
- Source :
- Operations Research; Jul/Aug72, Vol. 20 Issue 4, p800-812, 13p
- Publication Year :
- 1972
-
Abstract
- The estimate of expected critical-path length in PERT networks in this paper is usually better than the FULKERSON estimate because of greeter flexibility in choosing a path whose length approximates the length of the critical path. As the calculations are based on a model approximating the actual network, the new estimate may fall on either side of the expected critical path, even though the Fulkerson estimate never exceeded the expected critical-path length. A Fortran program was written to calculate the new estimate, whose calculation is more complicated than Fulkerson's estimate. The new estimate, Fulkerson's estimate, and the expected critical-path length are compared in several examples. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 0030364X
- Volume :
- 20
- Issue :
- 4
- Database :
- Complementary Index
- Journal :
- Operations Research
- Publication Type :
- Academic Journal
- Accession number :
- 8735130
- Full Text :
- https://doi.org/10.1287/opre.20.4.800