Back to Search Start Over

Dynamic Stray Current Evaluations on Cut-and-Cover Sections of DC Metro Systems.

Authors :
Charalambous, Charalambos A.
Aylott, Pete
Source :
IEEE Transactions on Vehicular Technology; Oct2014, Vol. 63 Issue 8, p3530-3538, 9p
Publication Year :
2014

Abstract

The tunneling construction in underground DC Metro Systems is mainly based on the bored tunnel method and the cut-and-cover method. Therefore, the stray current assessments and mitigation actions should be tailored according to which method of tunnel construction is used. This paper presents a topologically accurate model for assessing the dynamic stray current picture in cut-and-cover sections of DC metro systems. The dynamic stray current evaluation can provide an indication to the extent of the corrosion problem in the supporting and third-party infrastructures of the system. In this paper, the dynamic evaluations are based on a combination of various ideal and realistic train operation scenarios. [ABSTRACT FROM PUBLISHER]

Details

Language :
English
ISSN :
00189545
Volume :
63
Issue :
8
Database :
Complementary Index
Journal :
IEEE Transactions on Vehicular Technology
Publication Type :
Academic Journal
Accession number :
98976665
Full Text :
https://doi.org/10.1109/TVT.2014.2304522