Back to Search Start Over

Partie II. Une approche multicritère

Authors :
Makdessian, Lina
Yalaoui, Farouk
Dolgui, Alexandre
Source :
Journal of Decision Systems; January 2008, Vol. 17 Issue: 3 p337-368, 32p
Publication Year :
2008

Abstract

This article deals with line configuration problems for mass production. Such a production line is made of several workstations. Each station can contain one or several pieces of equipment and employees. Multi-objective optimization algorithms are proposed for two closed problems: P1, choosing equipment for each station and P2, both line balancing and equipment selection. Incompatibilities of pieces of equipment as well as precedence constraints among operations are taken into account. A multi-objectives MULTISTART algorithm and adapted NSGA-II are developed to solve these two problems. The obtained results are promising.

Details

Language :
English
ISSN :
12460125
Volume :
17
Issue :
3
Database :
Supplemental Index
Journal :
Journal of Decision Systems
Publication Type :
Periodical
Accession number :
ejs27415256
Full Text :
https://doi.org/10.3166/jds.17.337-368