Back to Search
Start Over
Resource load-based makespan estimation algorithm for resource-constrained project scheduling problem
- Source :
- ROADEF 2017, ROADEF 2017, Université de Lorraine; LCOMS, Feb 2017, Metz, France
- Publication Year :
- 2017
- Publisher :
- HAL CCSD, 2017.
-
Abstract
- International audience; The resource constrained project scheduling problem (RCPSP) is a well-known combinatorialoptimisation problem. It was shown by reduction from the 3-partition problem that the decisionvariant of the RCPSP isNP-complete in the strong sense even without precedence constraintsand only one resource [1]. A library of instances PSPLIB was created to compare solutionalgorithms and lower bounds, the most known approaches were presented in parts [2], [3] and [4].
- Subjects :
- [INFO.INFO-RO] Computer Science [cs]/Operations Research [cs.RO]
[MATH.MATH-OC] Mathematics [math]/Optimization and Control [math.OC]
bounds estimation
[INFO.INFO-RO]Computer Science [cs]/Operations Research [cs.RO]
[MATH.MATH-OC]Mathematics [math]/Optimization and Control [math.OC]
project scheduling
Operational research
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Journal :
- ROADEF 2017, ROADEF 2017, Université de Lorraine; LCOMS, Feb 2017, Metz, France
- Accession number :
- edsair.dedup.wf.001..42636f45639c13d9566aa57435bac788