Back to Search Start Over

Extension of the Lower Range Limit Based on Industrial Studies of the Reliability of High-Power Unit Eqipment

Authors :
V. I. Gombolevskii
M. A. Morozov
A. V. Meshkov
E. V. Somova
A. V. Krylov
Source :
Power Technology and Engineering. 54:404-409
Publication Year :
2020
Publisher :
Springer Science and Business Media LLC, 2020.

Abstract

For the 1200-MW power unit of the Kostroma SRPP, the lower limit of the lower range limit is 800 MW. This article presents the results of static field tests in unloading the power unit to 700 MW. Static and dynamic trials at the minimally achievable load with perturbations in the operating environment and fuel flow rate showed the reliability of operation of the power unit equipment in an expanded load range. Areliability assessment of the operation of components of the steam-and-water and air-gas paths, the feed-water pump group, and the draught equipment was conducted.

Details

ISSN :
15701468 and 1570145X
Volume :
54
Database :
OpenAIRE
Journal :
Power Technology and Engineering
Accession number :
edsair.doi...........0808cb28df813d3a1c9d3723ba88b58f
Full Text :
https://doi.org/10.1007/s10749-020-01223-w