Preventive maintenance task balancing with spare parts optimisation via big-bang big-crunch algorithm

Authors :
Sunday Ayoola Oke
Desmond Eseoghene Ighravwe
K.A. Adebiyi
Source :
International Journal of System Assurance Engineering and Management. 8:811-822
Publication Year :
2016
Publisher :
Springer Science and Business Media LLC, 2016.

Abstract

Work balancing increasingly plays an important role in both the production and maintenance functions. However, the literature on work balancing problems in transfer line manufacturing systems provides little information on the contributions of maintenance technicians and spare parts with a focus on penalty, technicians’ costs and incentives for staff. Unlike existing reports, the current investigation attempts to solve the maintenance task balancing problem. It combines preventive maintenance technicians’ assignments with product demand and spares utilisation in a transfer line manufacturing system. It uses an optimisation framework that measures the success of post-line balancing solution performance in a system from a holistic perspective. The novelty of the approach lies in the integration of technicians and spare parts theory and the introduction of penalty, technicians’ costs and incentive for staff. The proposed optimisation method was applied to a case study for detergent manufacturing system as a means of testing the effectiveness and robustness of the approach. The results show that the proposed model appears to be effective. Some simulations were also carried out to complement practical results.

Details

ISSN :
09764348 and 09756809
Volume :
8
Database :
OpenAIRE
Journal :
International Journal of System Assurance Engineering and Management
Accession number :
edsair.doi...........0e7ed77675e5da6afec9a702fd674cdb
Full Text :
https://doi.org/10.1007/s13198-016-0529-9