Integration of priority dispatching and due-date assignment in a job shop

Authors :
T.C.E. Cheng
Source :
International Journal of Systems Science. 19:1813-1825
Publication Year :
1988
Publisher :
Informa UK Limited, 1988.

Abstract

A simulation study to investigate the effect on missed due-dates and job flow-time is discussed by combining the job dispatching and due-date assignment decisions in job shop scheduling. A ‘semi-local’ due-date-oriented dispatching rule is designed which is able to monitor the progress of jobs closely. The performance of the dispatching rule is enhanced by a rational due-date assignment procedure which takes account of both job content and shop status information in determining due-dates. The simulation results show that the combined scheduling procedure performs better than some common simple dispatching rules which are used with the total-work-content (TWK) due-date assignment method.

Details

ISSN :
14645319 and 00207721
Volume :
19
Database :
OpenAIRE
Journal :
International Journal of Systems Science
Accession number :
edsair.doi...........105b8513ff0300dfb75537ca218f5cd3
Full Text :
https://doi.org/10.1080/00207728808964077