Integration of priority dispatching and due-date assignment in a job shop
- Source :
- International Journal of Systems Science. 19:1813-1825
- Publication Year :
- 1988
- Publisher :
- Informa UK Limited, 1988.
-
Abstract
- A simulation study to investigate the effect on missed due-dates and job flow-time is discussed by combining the job dispatching and due-date assignment decisions in job shop scheduling. A ‘semi-local’ due-date-oriented dispatching rule is designed which is able to monitor the progress of jobs closely. The performance of the dispatching rule is enhanced by a rational due-date assignment procedure which takes account of both job content and shop status information in determining due-dates. The simulation results show that the combined scheduling procedure performs better than some common simple dispatching rules which are used with the total-work-content (TWK) due-date assignment method.
- Subjects :
- Integrated business planning
Job content
Engineering
Job shop scheduling
Operations research
Job shop
business.industry
Real-time computing
Flow shop scheduling
Deadline-monotonic scheduling
Computer Science Applications
Theoretical Computer Science
Due date
Control and Systems Engineering
business
Scheduling (procedure)
Subjects
Details
- ISSN :
- 14645319 and 00207721
- Volume :
- 19
- Database :
- OpenAIRE
- Journal :
- International Journal of Systems Science
- Accession number :
- edsair.doi...........105b8513ff0300dfb75537ca218f5cd3
- Full Text :
- https://doi.org/10.1080/00207728808964077