Back to Search
Start Over
Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability
Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability
- Source :
- 45th AIAA/ASME/SAE/ASEE Joint Propulsion Conference & Exhibit.
- Publication Year :
- 2009
- Publisher :
- American Institute of Aeronautics and Astronautics, 2009.
-
Abstract
- Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.
- Subjects :
- Engineering
Work breakdown structure
business.industry
Process (engineering)
media_common.quotation_subject
Control (management)
Maintainability
Financial management
Cost reduction
Risk analysis (engineering)
Systems engineering
Space Transportation System
business
Function (engineering)
media_common
Subjects
Details
- Database :
- OpenAIRE
- Journal :
- 45th AIAA/ASME/SAE/ASEE Joint Propulsion Conference & Exhibit
- Accession number :
- edsair.doi...........190d7dd46fcb144302e876904b401cc1
- Full Text :
- https://doi.org/10.2514/6.2009-5345