Back to Search Start Over

A Transfer Trip Scheme to Supervise Zone 3 Operation

Authors :
J. Ganeswara Rao
Ashok Kumar Pradhan
Source :
INAE Letters. 1:9-13
Publication Year :
2016
Publisher :
Springer Science and Business Media LLC, 2016.

Abstract

Zone 3 of distance relay provides remote backup protection for adjacent transmission lines using local information. At times, zone 3 is prone to maloperation under stressed system conditions, which may cause serious threat to grid security. Zone 3 decisions can be more accurate, if fault pickup information of the adjacent line relays is availed. In this paper, zone 2 pickup signals of adjacent line relays are unified using simple logic gates and the information is transferred to supervise remote backup protection; the zone 3. Proposed method is tested for WSCC nine-bus and two-area four machine systems under different conditions and found to be accurate.

Details

ISSN :
23663278 and 2366326X
Volume :
1
Database :
OpenAIRE
Journal :
INAE Letters
Accession number :
edsair.doi...........1956ed1f9dcc8406e1ddcc0f7f8e2715
Full Text :
https://doi.org/10.1007/s41403-016-0002-8