Cite
Stress Analysis of a 600 MW Supercritical Boiler Start-Up Separator in Peak Load Operation
MLA
Dong Yi Li, et al. “Stress Analysis of a 600 MW Supercritical Boiler Start-Up Separator in Peak Load Operation.” Advanced Materials Research, vol. 601, Dec. 2012, pp. 149–57. EBSCOhost, https://doi.org/10.4028/www.scientific.net/amr.601.149.
APA
Dong Yi Li, Yuan Jing, Yuan Dai, Zhong Guang Fu, Qiang Zhang, & Hong Dou. (2012). Stress Analysis of a 600 MW Supercritical Boiler Start-Up Separator in Peak Load Operation. Advanced Materials Research, 601, 149–157. https://doi.org/10.4028/www.scientific.net/amr.601.149
Chicago
Dong Yi Li, Yuan Jing, Yuan Dai, Zhong Guang Fu, Qiang Zhang, and Hong Dou. 2012. “Stress Analysis of a 600 MW Supercritical Boiler Start-Up Separator in Peak Load Operation.” Advanced Materials Research 601 (December): 149–57. doi:10.4028/www.scientific.net/amr.601.149.