Back to Search Start Over

Nuclotron beam diagnostics

Authors :
A. Govorov
V. Mikhailov
Valery Volkov
A. Tsarenkov
A. Kirichenko
V. Andreev
S. Romanov
B. Sveshnikov
B. Vasilishin
I. Kulikov
Valery Monchinsky
V. Gorchenko
A. Kovalenko
M.A. Voevodin
Source :
Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
Publication Year :
2003
Publisher :
IEEE, 2003.

Abstract

The superconducting synchrotron Nuclotron was put into operation in March 1993 at the Laboratory of High Energies, JINR in Dubna. The Nuclotron Control System (NCS) provided an efficient support for machine operation during all runs. The dedicated NCS subsystem for beam diagnostics in the injection transfer line and the Nuclotron ring is described.

Details

Database :
OpenAIRE
Journal :
Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)
Accession number :
edsair.doi...........23ba2136b5445b3251a86d0e449f310d
Full Text :
https://doi.org/10.1109/pac.1999.794438