Back to Search
Start Over
Nuclotron beam diagnostics
- Source :
- Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
- Publication Year :
- 2003
- Publisher :
- IEEE, 2003.
-
Abstract
- The superconducting synchrotron Nuclotron was put into operation in March 1993 at the Laboratory of High Energies, JINR in Dubna. The Nuclotron Control System (NCS) provided an efficient support for machine operation during all runs. The dedicated NCS subsystem for beam diagnostics in the injection transfer line and the Nuclotron ring is described.
Details
- Database :
- OpenAIRE
- Journal :
- Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)
- Accession number :
- edsair.doi...........23ba2136b5445b3251a86d0e449f310d
- Full Text :
- https://doi.org/10.1109/pac.1999.794438