Back to Search
Start Over
Status of the H/sup -/ injector development program at LANSCE
- Source :
- Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
- Publication Year :
- 2003
- Publisher :
- IEEE, 2003.
-
Abstract
- The H/sup -/ injector at Los Alamos National Laboratory (LANL) is being upgraded to provide a 12% duty-factor, 40-mA, 80-kev H/sup -/ beams, which will enable 200-/spl mu/A operation of the Los Alamos Neutron Scattering Center (LANSCE) proton storage ring (PSR). An improved version of the LANSCE operational surface-conversion ion source and a new accelerating column have been developed in collaboration with the Lawrence Berkeley National Laboratory (LBNL) for this application. We report here the results of the initial tests at LANL on a proof-of-principle (POP) ion source built at LBNL and on modeling studies. The POP ion source has been operated at the 40-mA design beam current, and the beam emittance of the 80-keV extracted beam has been measured both at the exit of the accelerating column and in the 80-keV low-energy beam transport (LEBT) line. Significant, current-dependent, emittance growth was observed in the LEBT. Experimental investigations of this growth are described.
Details
- Database :
- OpenAIRE
- Journal :
- Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)
- Accession number :
- edsair.doi...........23d54e18eb6a698e11bd0c87b0ded676
- Full Text :
- https://doi.org/10.1109/pac.1999.794315