The Risk of High-Order Transmission Contingencies
- Source :
- 2007 IEEE Power Engineering Society General Meeting.
- Publication Year :
- 2007
- Publisher :
- IEEE, 2007.
-
Abstract
- High-order contingencies that are defined in NERC planning standards are not usually monitored in real-time operations, rather they are studied mostly in planning studies. This paper shows that although the chance of occurrence for high-order contingencies is quite small, it can contribute significantly to the overall risk of reliable system operation.