Back to Search Start Over

A Combined Well Completion and Flow Dynamic Modeling for a Dual-Lateral Well Load-up Investigation

Authors :
W.S. Huang
Y. Tang
Source :
IPTC 2007: International Petroleum Technology Conference.
Publication Year :
2007
Publisher :
European Association of Geoscientists & Engineers, 2007.

Abstract

A dual-lateral well was completed in a Chevron subsea condensate field with high peak rate. Within one year, the production significantly declined with high water-cut. The well was shut down and then brought back to production, observing much reduced flow rate for three days and eventually stopped flow.

Details

Database :
OpenAIRE
Journal :
IPTC 2007: International Petroleum Technology Conference
Accession number :
edsair.doi...........2e12175c0f3bd0793dc626dfe2f2471d
Full Text :
https://doi.org/10.3997/2214-4609-pdb.147.iptc11332