Field Tests on Pullout Loading Capacity of Suction Piles in Clay

Authors :
S. Bang
T. H. Lee
Y. Cho
E. S. Chung
Source :
Volume 1: Offshore Technology; Ocean Space Utilization.
Publication Year :
2003
Publisher :
ASMEDC, 2003.

Abstract

A series of field suction pile pullout tests were conducted inside the Okpo harbor located along the southern coast of Korea. Suction piles having inside diameters of 0.5, 1.0 and 1.5 meters and the length of five meters were tested. The seafloor condition at the Okpo harbor is predominantly clay. The piles were first installed by applying well-controlled suction pressure inside the pile. During the pullout tests, the load vs. pile displacement relationship and the water pressure variation inside the pile were carefully measured. The measurements were then used to validate an analytical solution that was developed previously to estimate the suction pile pullout loading capacity.Copyright © 2003 by ASME

Details

Database :
OpenAIRE
Journal :
Volume 1: Offshore Technology; Ocean Space Utilization
Accession number :
edsair.doi...........2e6b6064f50c64348dd296d3669e61ed
Full Text :
https://doi.org/10.1115/omae2003-37016