Back to Search
Start Over
Unique Infill Configuration To Unlock Additional Barrels in the Boscán Heavy-Oil Water-Injection Project
- Source :
- SPE Reservoir Evaluation & Engineering. 23:566-577
- Publication Year :
- 2020
- Publisher :
- Society of Petroleum Engineers (SPE), 2020.
-
Abstract
- Summary Boscán is a giant multibillion-barrel heavy-oil (10.5 °API and asphaltic) field in Venezuela. Although a large part of the field is on primary production with a low recovery factor ( Water injection in such heavy oil was previously considered not effective by the industry because of adverse mobility ratio. However, water injection for pressure maintenance (WIPM) was successfully implemented using a new pattern configuration, a pseudo-1-3-1 inverted- spot pattern (an additional row of producers between conventional-pattern rows). Field-data and reservoir-simulation models show increased reservoir pressure up to the second row of producers from the injector. The pressure support is used to significantly improve recovery using the unique configuration at low water cut. WIPM has already resulted in significant reserves addition. Current production from water-injection areas is approximately 40,000 MBOPD (or approximately 47% of field production). However, it is estimated that because of high oil viscosity, a significant amount of oil remains bypassed in the WIPM area. An infill opportunity was identified from an integrated reservoir-management study that included detailed WIPM data analysis and dynamic (mechanistic and full-field) modeling. A unique infill configuration is proposed that conceptually uses the current injectors with an additional row of producers between the existing first and second row of the producers. This configuration has the potential to economically unlock millions of barrels of bypassed oil and significantly increase recovery in this prolific heavy-oil field. This study provides insights into HMRWF behavior, evaluating the relative effect of displacement vs. pressure. The unique and novel infill configuration can be used to improve recovery, a step vital to monetize this large resource in the low-price environment.
- Subjects :
- Petroleum engineering
Energy Engineering and Power Technology
Geology
02 engineering and technology
010502 geochemistry & geophysics
01 natural sciences
Reservoir simulation
Fuel Technology
020401 chemical engineering
Infill
Oil water
0204 chemical engineering
0105 earth and related environmental sciences
Subjects
Details
- ISSN :
- 19300212 and 10946470
- Volume :
- 23
- Database :
- OpenAIRE
- Journal :
- SPE Reservoir Evaluation & Engineering
- Accession number :
- edsair.doi...........33050c0e2de2b940337b446155b4cfcb
- Full Text :
- https://doi.org/10.2118/189758-pa