Back to Search
Start Over
Beam Dynamics of the Transparent Injection for the MAX IV 1.5 GeV Ring
- Publication Year :
- 2022
- Publisher :
- JACoW Publishing, Geneva, Switzerland, 2022.
-
Abstract
- Following the successful operation of the Multipole Injection Kicker (MIK) in the MAX IV 3 GeV storage ring, we plan to introduce a similar device in the MAX IV 1.5 GeV ring. In order to assess the effectiveness of such device and to define its working parameters, we performed a series of studies aimed at understanding the beam dynamics related to the injection process. In this paper we describe the optimization of the MIK working parameters, we study the resilience to tune shifts for a chosen injection scheme and illustrate some tests conducted to evaluate the ring acceptance. We conclude with remarks about the effects of magnet errors on key performance parameters such as the injection efficiency and perturbations to the size and divergence of the stored beam and a brief discussion on future work.<br />Proceedings of the 13th International Particle Accelerator Conference, IPAC2022, Bangkok, Thailand
- Subjects :
- MC5: Beam Dynamics and EM Fields
Accelerator Physics
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........38e0173c2aea6f46c324d74f74bd1c54
- Full Text :
- https://doi.org/10.18429/jacow-ipac2022-mopopt022