Back to Search Start Over

Choosing Appropriate Contract Methods for Design-Build Projects

Authors :
Qing Chen
Zhigang Jin
Yi Hu
Bo Xia
Peng Wu
Source :
Journal of Management in Engineering. 32
Publication Year :
2016
Publisher :
American Society of Civil Engineers (ASCE), 2016.

Abstract

For design-build (DB) projects, owners normally use lump sum and guaranteed maximum price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to c...

Details

ISSN :
19435479 and 0742597X
Volume :
32
Database :
OpenAIRE
Journal :
Journal of Management in Engineering
Accession number :
edsair.doi...........3f1da4e4d1289655e38315bd73afa0b3
Full Text :
https://doi.org/10.1061/(asce)me.1943-5479.0000393