Back to Search
Start Over
Beam position monitor and its calibration in J-PARC LINAC
- Source :
- 2007 IEEE Particle Accelerator Conference (PAC).
- Publication Year :
- 2007
- Publisher :
- IEEE, 2007.
-
Abstract
- The beam commissioning of J-PARC LINAC has been started in November 2006. Beam position monitors (BPMs) which had been calibrated on the bench setup with a scanning wire, take beam-based-calibration method in order to enable the beam to pass at the centre of a quadrupole magnet (Q-magnet). In this presentation, the installed BPMs and their calibration methods are described.
- Subjects :
- Physics
Physics::Instrumentation and Detectors
business.industry
Beam commissioning
Astrophysics::Instrumentation and Methods for Astrophysics
Beam position monitor
Linear particle accelerator
Optics
Nuclear magnetic resonance
Calibration
Physics::Accelerator Physics
J-PARC
Quadrupole magnet
business
Beam (structure)
Subjects
Details
- Database :
- OpenAIRE
- Journal :
- 2007 IEEE Particle Accelerator Conference (PAC)
- Accession number :
- edsair.doi...........5b5ba581792f528672a9e7784e2cfbdb
- Full Text :
- https://doi.org/10.1109/pac.2007.4439961