Cite
Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
MLA
A. G. Anisimov, et al. “Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine.” Power Technology and Engineering, vol. 49, Jan. 2016, pp. 359–64. EBSCOhost, https://doi.org/10.1007/s10749-016-0628-4.
APA
A. G. Anisimov, A. R. Gevorgyan, S. Kh. Eritsyan, G. S. Petrosyan, M. V. Klub, A. V. Avtandilyan, & K. B. Sargsyan. (2016). Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine. Power Technology and Engineering, 49, 359–364. https://doi.org/10.1007/s10749-016-0628-4
Chicago
A. G. Anisimov, A. R. Gevorgyan, S. Kh. Eritsyan, G. S. Petrosyan, M. V. Klub, A. V. Avtandilyan, and K. B. Sargsyan. 2016. “Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine.” Power Technology and Engineering 49 (January): 359–64. doi:10.1007/s10749-016-0628-4.