Cite
Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines
MLA
Zailin Guan, et al. “Hybrid Spider Monkey Optimisation Algorithm for Multi-Level Planning and Scheduling Problems of Assembly Lines.” International Journal of Production Research, vol. 58, Oct. 2019, pp. 6252–67. EBSCOhost, https://doi.org/10.1080/00207543.2019.1675917.
APA
Zailin Guan, Lei Yue, Li Zhang, Jabir Mumtaz, & Cong He. (2019). Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines. International Journal of Production Research, 58, 6252–6267. https://doi.org/10.1080/00207543.2019.1675917
Chicago
Zailin Guan, Lei Yue, Li Zhang, Jabir Mumtaz, and Cong He. 2019. “Hybrid Spider Monkey Optimisation Algorithm for Multi-Level Planning and Scheduling Problems of Assembly Lines.” International Journal of Production Research 58 (October): 6252–67. doi:10.1080/00207543.2019.1675917.