Integrated BIM and DfMA parametric and algorithmic design based collaboration for supporting client engagement within offsite construction

Authors :
Mohammad Reza Chenaghlou
Nashwan Dawood
Sajjad Bakhshi
Farzad Pour Rahimian
David J. Edwards
Source :
Automation in Construction. 133:104015
Publication Year :
2022
Publisher :
Elsevier BV, 2022.

Abstract

As a proactive reaction to current ineffective collaboration strategies, this study sought to combine the capabilities of Building Information Modelling (BIM) in the Design for Manufacturing and Assembly (DfMA) method with mass customisation into a framework that enables customers to participate in the offsite construction configuration process. This approach engenders greater customer satisfaction whilst increasing production and construction efficiency. A model capable of facilitating the use of construction information in the proposed framework was developed to implement the proposed framework into practice. Combining the BIM model within the framework provides all project stakeholders with prerequisite information needed for a building's configuration. This collaborative process utilises an algorithmic composition in which the current assembly information in both the BIM model and framework is used as a controlling factor in the configuration process. The parametric environment of Revit and the algorithmic environment of the Dynamo plugin were used to realise the proposed framework (as a proof of concept).

Details

ISSN :
09265805
Volume :
133
Database :
OpenAIRE
Journal :
Automation in Construction
Accession number :
edsair.doi...........8aba6eccb53cd5bcc7c52fa9d89fa5cc
Full Text :
https://doi.org/10.1016/j.autcon.2021.104015