Initial Flow Testing of the Phase II Reservoir, Redrilling of EE-2, and Static Reservoir Pressure Testing

Authors :
Grant Heiken
Vivi Thomas Hriscu
David V. Duchane
Donald W. Brown
Source :
Mining the Earth's Heat: Hot Dry Rock Geothermal Energy ISBN: 9783540673163
Publication Year :
2012
Publisher :
Springer Berlin Heidelberg, 2012.

Abstract

The demonstration of flow connectivity between the redrilled EE-3A wellbore and the EE-2 reservoir zone (Expts. 2059 and 2062) made it clear that a viable HDR system had finally been established, although that stage of the Fenton Hill HDR Project took about 5 years (1980–1985)—much longer than originally anticipated. Throughout that period, Germany and Japan contributed both funds and manpower to the effort. The Germans withdrew from the Project at the end of 1985, but the Japanese maintained a presence through the following year. In early 1986, they began pressing strongly for the thermal and flow characteristics of the HDR system to be evaluated.

Details

ISBN :
978-3-540-67316-3
ISBNs :
9783540673163
Database :
OpenAIRE
Journal :
Mining the Earth's Heat: Hot Dry Rock Geothermal Energy ISBN: 9783540673163
Accession number :
edsair.doi...........8edc0b19bd9f6a241c2db0213f468477
Full Text :
https://doi.org/10.1007/978-3-540-68910-2_7