Back to Search
Start Over
Lattice Boltzmann simulation for grout filling process during simultaneous backfill grouting of shield in tunnel construction
- Source :
- European Journal of Environmental and Civil Engineering. 26:4039-4054
- Publication Year :
- 2020
- Publisher :
- Informa UK Limited, 2020.
-
Abstract
- Over the years, it has become obvious that simultaneous backfill grouting is of great significance to the design of the tunnel lining and process control of shield construction. It is essential to ...
- Subjects :
- Environmental Engineering
Materials science
Computer simulation
Grout
0211 other engineering and technologies
Process (computing)
Lattice Boltzmann methods
02 engineering and technology
Mechanics
engineering.material
Tunnel construction
Lattice boltzmann simulation
Shield
021105 building & construction
engineering
Process control
021101 geological & geomatics engineering
Civil and Structural Engineering
Subjects
Details
- ISSN :
- 21167214 and 19648189
- Volume :
- 26
- Database :
- OpenAIRE
- Journal :
- European Journal of Environmental and Civil Engineering
- Accession number :
- edsair.doi...........94ccd26bf57a79d9794d482d34daa469