Toward Completion and Delivery of the First EU ITER Magnets

Authors :
Eva Boter Rebollo
Marc Jimenez
Pierlugi Valente
Alessandro Lo Bue
B. Bellesia
Daniel Rossi
M. Cornelis
E. Viladiu
Cesar Luongo
P. Readman
L. Poncet
T. Boutboul
Piergiorgio Aprili
Valerie Casarin
Monica Martinez
Angela Hernandez
C. Sborchia
Maria Paz Casas Lino
Ander Loizaga
Pierre Gavouyere-Lasserre
Charalampos Kostopoulos
Rita Batista
Alessandro Bonito Oliva
Sebastien Koczorowski
Gennaro Romano
Byung Su Lim
Neil Mitchell
Edoardo Pompa
Pedro Carvas de Sousa
R. Harrison
Eduard Pozuelo-Segura
Source :
IEEE Transactions on Applied Superconductivity. 30:1-13
Publication Year :
2020
Publisher :
Institute of Electrical and Electronics Engineers (IEEE), 2020.

Abstract

The plasma confinement of the International Tokamak Experimental Rector (ITER) is provided by the magnetic field generated by 18 toroidal field (TF) coils while 6 poloidal field (PF) and 6 central solenoid coils have the function to drive, shape and pre-heat the plasma. Fusion for Energy (F4E), the European Domestic Agency for ITER, is responsible for the supply of 10 TF coils and 5 PF coils to the ITER project. The ITER Organization (IO) team is instead responsible for the design of such coils as well for the coordination of the activities of the different Domestic Agencies (DAs) producing the different components, and their assembly into the Tokamak. The PF coils utilize NbTi Cable-in-Conduit-Conductor and have different diameters between 8 and 24 meters and weights of up to 400 tons. Regarding the PF coils produced by F4E, so far one has been completed by the Institute of Plasma Physics Chinese Academy of Sciences (ASIPP) under a collaboration agreement with F4E. The other 4 PF coils are being produced at the ITER site in Saint Paul lez Durance, France, under F4E supervision. The first of these (PF5) will be completed by July 2020 while the last coil (PF3) will be ready be the end of 2023. The TF coils utilize Nb3Sn conductor and are manufactured with the “Wind, React & Transfer” method. The first TF coil is close to completion and will be delivered to the ITER site in early 2020. Subsequent TF coils will follow at a rate of about one every 3-4 months. In this article we will report on the production status of both PF and TF coils and, in particular, the different manufacturing strategies employed. The main challenges faced so far and the results obtained are also described.

Details

ISSN :
23787074 and 10518223
Volume :
30
Database :
OpenAIRE
Journal :
IEEE Transactions on Applied Superconductivity
Accession number :
edsair.doi...........97cf3f69a45cff36685adc07ef91e146
Full Text :
https://doi.org/10.1109/tasc.2020.2979397