Back to Search Start Over

Study on Operation Scenario of Tritium Production for a Fusion Reactor Using a High Temperature Gas-Cooled Reactor

Authors :
Minoru Goto
Yasuko Kawamoto
Hideaki Matsuura
Kazunari Katayama
Shigeaki Nakagawa
Hiroyuki Nakaya
Source :
Fusion Science and Technology. 68:397-401
Publication Year :
2015
Publisher :
Informa UK Limited, 2015.

Abstract

To start up a fusion reactor, it is necessary to provide a sufficient amount of tritium from an external device. The fusion DEMO reactor is planned to start up in the 2030s. Herein, methods for supplying the reactor with tritium are discussed. For the initial startup of the fusion reactor, use of a high temperature gas-cooled reactor (HTGR) as a tritium production device has been proposed. So far, the analyses have been focused only on the operation in which fuel is exchanged at stated periods (batch) using the block type HTGR. In this paper, to improve the performance of tritium production, properties of the HTGR are studied from the viewpoint of continuous operation for several conditions. In continuous operation, for example, in the pebble bed type HTGR, it is possible to design an operation that has no time loss for refueling. The pebble bed modular reactor (PBMR) and the gas turbine high temperature reactor of 300 MWe nominal capacity (GTHTR300) are assumed as the calculation and comparison targets, ...

Details

ISSN :
19437641 and 15361055
Volume :
68
Database :
OpenAIRE
Journal :
Fusion Science and Technology
Accession number :
edsair.doi...........9c8be50ef07c88beaa4ed9d329abff3b