Back to Search Start Over

Beam commissioning of the Jj-Parc Linac medium energy beam transport at kek

Authors :
T. Kobayashi
S. Anami
M. Okada
N. Kamikubota
Kazuo Hasegawa
M.Kawamura
Y. Kondo
Robert D. Ryne
Ji Qiang
J. Kishiro
T. Kato
S. Arai
Yuji Fukui
Kiyoshi Ikegami
Hitoshi Kobayashi
Fujio Naito
S. Noguchi
J. Chiba
S. Wang
Z. Igarashi
Y.Yamazaki
A. Ueno
Shigeki Fukuda
E. Takasaki
Hiroshi Yoshikawa
H. Tanaka
K. Nigorikawa
Takashi Ito
S. Fu
K. Yoshino
S. Yamaguchi
E. Kadokura
Masanori Ikegami
C. Kubota
Source :
Proceedings of the 2003 Bipolar/BiCMOS Circuits and Technology Meeting (IEEE Cat. No.03CH37440).
Publication Year :
2004
Publisher :
IEEE, 2004.

Abstract

The construction of the initial part of the J-PARC linac has been started at KEK for beam tests before moving to the JAERI Tokai campus, where J-PARC facility is finally to be constructed. The RFQ and MEBT (Medium Energy Beam Transport) have already been installed at KEK, and the beam test has been performed successfully. In this paper, the experimental results of the beam tests are presented together with simulation results with a 3D PIC (Particle-In-Cell) code.

Details

Database :
OpenAIRE
Journal :
Proceedings of the 2003 Bipolar/BiCMOS Circuits and Technology Meeting (IEEE Cat. No.03CH37440)
Accession number :
edsair.doi...........9fb276048b544e2ba8cb3edd3accf197
Full Text :
https://doi.org/10.1109/pac.2003.1288577