Back to Search Start Over

Three reliability models of a building cable manufacturing plant: a comparative analysis

Authors :
Gulshan Taneja
S. M. Rizwan
Babakalli Alkali
S. Z. Taj
David K. Harrison
Source :
International Journal of System Assurance Engineering and Management. 11:239-246
Publication Year :
2020
Publisher :
Springer Science and Business Media LLC, 2020.

Abstract

In this paper, comparative analysis between the profits of three reliability models of a building cable manufacturing plant is carried out. To facilitate the analysis, real maintenance data of the plant are collected. Three case specific reliability models of the plant are developed. Semi-Markov processes and regenerative point techniques are used to estimate optimized reliability indices of the plant; such as; mean time to plant failure, plant availability, expected number of plant repairs, expected busy period of the repairman and profit incurred to the plant. Comparison between the profits is demonstrated through graphical analysis.

Details

ISSN :
09764348 and 09756809
Volume :
11
Database :
OpenAIRE
Journal :
International Journal of System Assurance Engineering and Management
Accession number :
edsair.doi...........ae9f7ffe6936711158695d517eee9e05
Full Text :
https://doi.org/10.1007/s13198-020-01012-8