Back to Search Start Over

A power supply system for a 125 keV/250 keV neutral beam injector test stand based on negative ion sources

Authors :
K. Tsmori
T. Kawamoto
Osamu Kaneko
Tsutomu Kuroda
Yoshihide Oka
R. Akiyama
Yasuhiro Suzuki
Akira Ando
R. Iibuchi
Yasuhiko Takeiri
T. Shodo
M. Naito
Fusao Saito
Source :
Fusion Engineering and Design. 26:535-538
Publication Year :
1995
Publisher :
Elsevier BV, 1995.

Abstract

A design for a power supply system for the neutral beam injection (NBI) test stand of the large helical device (LHD) is presented. The acceleration power supply of −250 kV, 50 A is composed of three power supplies connected in series to deliver two intermediate outputs. It has a −40 kV power supply, a −90 kV power supply and a −120 kV power supply. A beamline and the major part of the power supply system for the NBI test stand were constructed in 1992. The −120 kV power supply was moved from Higashiyama to Toki in 1994. Another power supply of −40 kV will be added for −250 kV acceleration in the future. A brief outline of the control system of the NBI test stand is also presented.

Details

ISSN :
09203796
Volume :
26
Database :
OpenAIRE
Journal :
Fusion Engineering and Design
Accession number :
edsair.doi...........b856bc59e7caf7150dfd5ec3edec6e03
Full Text :
https://doi.org/10.1016/0920-3796(94)00221-r