Cite
A two-phase simple model to determine the timing and duration of R&D project tasks
MLA
Abraham Mehrez. “A Two-Phase Simple Model to Determine the Timing and Duration of R&D Project Tasks.” Production Planning & Control, vol. 10, Jan. 1999, pp. 48–53. EBSCOhost, https://doi.org/10.1080/095372899233415.
APA
Abraham Mehrez. (1999). A two-phase simple model to determine the timing and duration of R&D project tasks. Production Planning & Control, 10, 48–53. https://doi.org/10.1080/095372899233415
Chicago
Abraham Mehrez. 1999. “A Two-Phase Simple Model to Determine the Timing and Duration of R&D Project Tasks.” Production Planning & Control 10 (January): 48–53. doi:10.1080/095372899233415.