Back to Search Start Over

Cracks evaluation at a pier of a curved box girder bridge during its balanced cantilever construction sequence

Authors :
N H Hidayat
H Purnomo
Source :
IOP Conference Series: Earth and Environmental Science. 1173:012005
Publication Year :
2023
Publisher :
IOP Publishing, 2023.

Abstract

In urban area, modern role of bridges is to connect two or more locations. In that area, it is often to construct long span road crossing curved integral bridges consisting of several spans. In this study, the same type of bridge which is located at the intersection of an existing road and an elevated toll road in Jakarta showed cracks at one of the piers during construction of bridge segments. Construction time started from the beginning of 2016 until the end of 2018. Observations were done after the occurrence of cracks by installing strain gauge sensor at the lower part of the pier. Strain from the strain gauge is not only influenced by the construction activities but it is also influenced by the temperature of the surrounding environment. Construction staging analysis using MIDAS Civil software was conducted to evaluate the cracks. Numerical strain evaluation was done by considering the temperature effect taken from the measurement. Both stress which is calculated from the strain obtained by the measurement and construction staging analysis are in good concordance. Using the allowable stress limit for both obtained stress, the actual condition at the pier were verified.

Subjects

Subjects :
General Medicine
General Chemistry

Details

ISSN :
17551315 and 17551307
Volume :
1173
Database :
OpenAIRE
Journal :
IOP Conference Series: Earth and Environmental Science
Accession number :