Back to Search Start Over

The Upgrade of the CERN Proton Synchrotron Booster Transfer Line Magnets

Authors :
Antony Newborough
Source :
IEEE Transactions on Applied Superconductivity. 30:1-5
Publication Year :
2020
Publisher :
Institute of Electrical and Electronics Engineers (IEEE), 2020.

Abstract

The CERN PSB (Proton Synchrotron Booster) is currently undergoing a major upgrade with an increase in both injection and extraction energy. With the connection of the new LINAC 4, which replaces the now decommissioned LINAC 2, the energy of the beam to be transported to the PSB is increased from 50 MeV to 160 MeV. Simultaneously, the PSB will be upgraded to provide protons to the CERN PS (Proton Synchrotron) with an increase of energy from 1.4 GeV to 2 GeV. To cope with these increases, more than 40 magnets in the transfer lines to and from the PSB will be replaced with new magnets. This paper gives an overview of the challenges and chosen solutions concerned by these upgrades.

Details

ISSN :
23787074 and 10518223
Volume :
30
Database :
OpenAIRE
Journal :
IEEE Transactions on Applied Superconductivity
Accession number :
edsair.doi...........e2bb5cbd0234662221825e5a7583ffd2
Full Text :
https://doi.org/10.1109/tasc.2020.2967334