Cite
Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations
MLA
Izak Cohen, et al. “Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations.” IEEE Transactions on Engineering Management, vol. 63, Feb. 2016, pp. 4–15. EBSCOhost, https://doi.org/10.1109/tem.2015.2497209.
APA
Izak Cohen, Noemie Balouka, & Avraham Shtub. (2016). Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations. IEEE Transactions on Engineering Management, 63, 4–15. https://doi.org/10.1109/tem.2015.2497209
Chicago
Izak Cohen, Noemie Balouka, and Avraham Shtub. 2016. “Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations.” IEEE Transactions on Engineering Management 63 (February): 4–15. doi:10.1109/tem.2015.2497209.