Back to Search Start Over

Research on Reasonable Time Limit of Project Based on Monte-Carlo Computer Simulation

Authors :
Zheng Huimin
Chen Xuan
Source :
Advances in Intelligent Systems and Computing ISBN: 9783319987750
Publication Year :
2018
Publisher :
Springer International Publishing, 2018.

Abstract

There are many uncertain factors in the actual project. The duration of the process is used as a decision variable, the multi objective function of time, cost and quality is described fuzzy, and the fuzzy equilibrium optimization model based on the three parties is established in this paper. The precision of the time limit obtained by the traditional PERT algorithm is low, In combination with engineering practice, The Monte-Carlo simulation method is used to solve the model more efficiently and provide the basis for determining the reasonable time limit of the project.

Details

ISBN :
978-3-319-98775-0
ISBNs :
9783319987750
Database :
OpenAIRE
Journal :
Advances in Intelligent Systems and Computing ISBN: 9783319987750
Accession number :
edsair.doi...........e70d041a71cfa0eec05eeed4b945034b
Full Text :
https://doi.org/10.1007/978-3-319-98776-7_142