Back to Search Start Over

A capacity-constrained multi-level inventory and production control problem

Authors :
Anders Segerstedt
Source :
International Journal of Production Economics. 45:449-461
Publication Year :
1996
Publisher :
Elsevier BV, 1996.

Abstract

This paper presents a mathematical formulation of a capacity constrained multistage inventory and production control problem. It argues that most practical multistage inventory and production control problems can be summarised in the formulation. The model has a strong connection to the model of Billington, McClain and Thomas (1983) and is also inspired of a paper from Bard and Golany (1991). The revised Billington/McClain/Thomas model is formulated in a dynamic programming recursion. A numerical solution to a simple problem is presented. A scheduling problem concerning capacity constrained models are enlightened. Further, the paper points to differences and relationships between this capacity constrained model, MRP, Kanban and Cover-Time Planning.

Details

ISSN :
09255273
Volume :
45
Database :
OpenAIRE
Journal :
International Journal of Production Economics
Accession number :
edsair.doi...........f9e573c41b96212a58cdb3e12e8d0278
Full Text :
https://doi.org/10.1016/0925-5273(96)00017-5