Back to Search
Start Over
A capacity-constrained multi-level inventory and production control problem
- Source :
- International Journal of Production Economics. 45:449-461
- Publication Year :
- 1996
- Publisher :
- Elsevier BV, 1996.
-
Abstract
- This paper presents a mathematical formulation of a capacity constrained multistage inventory and production control problem. It argues that most practical multistage inventory and production control problems can be summarised in the formulation. The model has a strong connection to the model of Billington, McClain and Thomas (1983) and is also inspired of a paper from Bard and Golany (1991). The revised Billington/McClain/Thomas model is formulated in a dynamic programming recursion. A numerical solution to a simple problem is presented. A scheduling problem concerning capacity constrained models are enlightened. Further, the paper points to differences and relationships between this capacity constrained model, MRP, Kanban and Cover-Time Planning.
- Subjects :
- Dynamic programming
Economics and Econometrics
Mathematical optimization
Job shop scheduling
Operations research
Computer science
Simple (abstract algebra)
Production control
Management Science and Operations Research
General Business, Management and Accounting
Industrial and Manufacturing Engineering
Subjects
Details
- ISSN :
- 09255273
- Volume :
- 45
- Database :
- OpenAIRE
- Journal :
- International Journal of Production Economics
- Accession number :
- edsair.doi...........f9e573c41b96212a58cdb3e12e8d0278
- Full Text :
- https://doi.org/10.1016/0925-5273(96)00017-5