Back to Search
Start Over
SARAF Commissioning: Injector, MEBT and Chopper
- Publication Year :
- 2022
- Publisher :
- JACoW Publishing, Geneva, Switzerland, 2022.
-
Abstract
- IAEC/SNRC (Israel) is constructing an accelerator fa-cility, SARAF, for neutron production. It is based on a linac accelerating 5 mA CW deuteron and proton beam up to 40 MeV. As a first phase, IAEC constructed and operated a linac (SARAF Phase I), from which remains an ECR ion source, a Low-Energy Beam Transport (LEBT) line and a 4-rod RFQ. Since 2015, IAEC and CEA (France) are collaborating in the second phase, consisting in manufacturing of the linac (Figure 1). The injector control-system has been recently updated and the Medium Energy Beam Transport (MEBT) line has been installed and integrated to the infrastructure. It has been partially commissioned during the first semester of 2022. This paper presents the results of the integration, tests and commissioning of the injector and MEBT, be-fore delivery of the cryomodules.<br />Proceedings of the 31st International Linear Accelerator Conference, LINAC2022, Liverpool, UK
- Subjects :
- Proton and Ion Accelerators and Applications
Accelerator Physics
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........fa8707466f28cb8c45668a8a1acd6019
- Full Text :
- https://doi.org/10.18429/jacow-linac2022-fr1aa04