Back to Search Start Over

Models for Safety Assessment of Construction Project With Some 2-Tuple Linguistic Pythagorean Fuzzy Bonferroni Mean Operators

Authors :
Xiumei Deng
Hui Gao
Guiwu Wei
Jie Wang
Source :
IEEE Access, Vol 6, Pp 52105-52137 (2018)
Publication Year :
2018
Publisher :
Institute of Electrical and Electronics Engineers (IEEE), 2018.

Abstract

For this paper, to consider both Bonferroni mean (BM) operator and two-tuple linguistic Pythagorean fuzzy numbers (2TLPFNs), we combine the weighted BM (WBM) operator, the generalized WBM (GWBM) operator, and the dual GWBM operator with 2TLPFNs to propose the two-tuple linguistic Pythagorean WBM (2TLPFWBM) operator, the 2TLPFWGBM operator, the generalized 2TLPFWBM (G2TLPFWBM) operator, the generalized 2TLPFWGBM operator, the dual G2TLPFWBM operator, and the dual G2TLPFWGBM operator. Then, some MADM procedures are developed based on these operators. At last, an applicable example for a safety assessment of construction project is given.

Details

ISSN :
21693536
Volume :
6
Database :
OpenAIRE
Journal :
IEEE Access
Accession number :
edsair.doi.dedup.....0c39fab4aa9c8ff59d51f5808f162757