Back to Search
Start Over
Beam commissioning of the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex
- Source :
- Physical Review Special Topics. Accelerators and Beams, Vol 12, Iss 4, p 040402 (2009)
- Publication Year :
- 2009
- Publisher :
- American Physical Society, 2009.
-
Abstract
- The 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) was commissioned in October 2007, and successfully accomplished 3 GeV acceleration on October 31. Six run cycles through February 2008 were dedicated to commissioning the RCS, for which the initial machine parameter tuning and various underlying beam studies were completed. Then since May 2008 the RCS beam has been delivered to the downstream facilities for their beam commissioning. In this paper we describe beam tuning and study results following our beam commissioning scenario and a beam performance and operational experience obtained in the first commissioning phase through June 2008.
- Subjects :
- Physics
Nuclear and High Energy Physics
medicine.medical_specialty
Physics and Astronomy (miscellaneous)
Nuclear engineering
Beam commissioning
Particle accelerator
Surfaces and Interfaces
Beam optics
Synchrotron
law.invention
Acceleration
Rapid cycling
law
medicine
lcsh:QC770-798
Medical physics
lcsh:Nuclear and particle physics. Atomic energy. Radioactivity
Beam (structure)
Subjects
Details
- Language :
- English
- ISSN :
- 10984402
- Volume :
- 12
- Issue :
- 4
- Database :
- OpenAIRE
- Journal :
- Physical Review Special Topics. Accelerators and Beams
- Accession number :
- edsair.doi.dedup.....23fd6545b3aed9e374b2b0cb8a939f63