Back to Search
Start Over
Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
- Publication Year :
- 2022
-
Abstract
- In the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This contribution reports on the studies carried out during the beam commissioning of the BGI system in a turn-by-turn matching monitor mode for its eventual implementation in an optimisation framework to preserve emittance during transfer between the PS Booster and PS. The BGI commissioning included a benchmarking with data from a wire-grid secondary emission monitor inserted into the circulating beam.<br />Proceedings of the 13th International Particle Accelerator Conference, IPAC2022, Bangkok, Thailand
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.doi.dedup.....2622c778a20da5e1160c71a04318fb76