Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage
- Source :
- SSRN Electronic Journal.
- Publication Year :
- 2018
- Publisher :
- Elsevier BV, 2018.
-
Abstract
- This study provides an independent, outside-in estimate of the cost and schedule risks of nuclear waste storage projects. Based on a reference class of 216 past, comparable projects, risk of cost overrun was found to be 202% or less, with 80% certainty, i.e., 20% risk of an overrun above 202%. Based on a reference class of 200 past, comparable projects, risk of schedule overrun was found to be 104% or less, with 80% certainty, i.e., 20% risk of overrun above 104%. Cost risk and schedule risk are both substantial for nuclear waste storage projects.<br />arXiv admin note: substantial text overlap with arXiv:1901.03698
- Subjects :
- Schedule
Waste management
business.industry
Underground mining (hard rock)
Radioactive waste
ComputerApplications_COMPUTERSINOTHERSYSTEMS
Nuclear power
FOS: Economics and business
Cost overrun
Dry storage
Risk analysis (business)
Environmental science
Nuclear waste storage
General Finance (q-fin.GN)
Quantitative Finance - General Finance
business
Subjects
Details
- ISSN :
- 15565068
- Database :
- OpenAIRE
- Journal :
- SSRN Electronic Journal
- Accession number :
- edsair.doi.dedup.....27456a555f98d13b2c6f5467e8ea04e3
- Full Text :
- https://doi.org/10.2139/ssrn.3303410