Analysis on the Settlement of Adjacent Buildings Caused by the Underpassing Construction of the Biased Tunnel
- Source :
- E3S Web of Conferences, Vol 272, p 02022 (2021)
- Publication Year :
- 2021
- Publisher :
- EDP Sciences, 2021.
-
Abstract
- Through the simulation analysis of the settlement and deformation law of the surface buildings caused by the construction of the biased tunnel, the following points are obtained: (1) The Peak formula is revised, and the influence range of the biased tunnel is predicted based on the formula. (2) It is concluded that when the tunnel is biased, the position of maximum deformation caused by ground settlement is generally in a parallel area 0.5 times the buried depth from the center line of the tunnel. (3) Through the double-layer verification of simulation analysis and monitoring measurement data, prior to the construction of buildings with similar weak foundations, their foundations should be reinforced in advance. (4) In the process of this simulation, the complicated influence of water pressure on tunnel excavation was not considered, which can be further optimized in the later stage.
Details
- Language :
- English
- ISSN :
- 22671242
- Volume :
- 272
- Database :
- OpenAIRE
- Journal :
- E3S Web of Conferences
- Accession number :
- edsair.doi.dedup.....52ce47f69a874908dae99317b6545360