Back to Search Start Over

Transient Simulation of a Solar-hybrid Tower Power Plant with Open Volumetric Receiver at the Location Barstow

Authors :
Bernhard Hoffschmidt
Christoph Rau
J. Sattler
Spiros Alexopoulos
G. Breitbach
Markus Latzke
Source :
Energy Procedia. :1481-1490
Publisher :
C. Rau. Published by Elsevier Ltd.

Abstract

In this work the transient simulations of four hybrid solar tower power plant concepts with open-volumetric receiver technology for a location in Barstow-Daggett, USA, are presented. The open-volumetric receiver uses ambient air as heat transfer fluid and the hybridization is realized with a gas turbine. The Rankine cycle is heated by solar-heated air and/or by the gas turbine's flue gases. The plant can be operated in solar-only, hybrid parallel or combined cycle-only mode as well as in any intermediate load levels where the solar portion can vary between 0 to 100%. The simulated plant is based on the configuration of a solar-hybrid power tower project, which is in planning for a site in Northern Algeria. The meteorological data for Barstow-Daggett was taken from the software meteonorm. The solar power tower simulation tool has been developed in the simulation environment MATLAB/Simulink and is validated.

Details

Language :
English
ISSN :
18766102
Database :
OpenAIRE
Journal :
Energy Procedia
Accession number :
edsair.doi.dedup.....54100c5a435ac353a3cd7728adedf3fb
Full Text :
https://doi.org/10.1016/j.egypro.2014.03.157