Back to Search Start Over

SRF gun development at DESY

Authors :
Vogel, Elmar
Barbanotti, Serena
Hartl, Ingmar
Jensch, Kay
Klinke, Daniel
Kostin, Denis
Lorkiewicz, Jerzy
Möller, Wolf-Dietrich
Nietubyć, Robert
Schmökel, Manuela
Sekutowicz, Jacek
Sievers, Sven
Smedley, John
Steinhau-Kühl, Nicolai
Sulimov, Alexey
Teichert, Jochen
Thie, Jan-Hendrik
Weise, Hans
Wiencek, Mateusz
Winkelmann, Lutz
Van Der Horst, Birte
Source :
29th Linear Accelerator Conference-LINAC18, 16.-21.09.2018, Beijing, China, 29th Linear Accelerator Conference-LINAC18, 16.-21.09.2018, Beijing, ChinaProc. of 29th Linear Accelerator Conference-LINAC18, Genf: JACoW, Geneva : JACoW 20-24 (2018). doi:10.3204/PUBDB-2018-03813, 29th Linear Accelerator Conference, LINAC 2018, Beijing, China, 2018-09-17-2018-09-21
Publication Year :
2018

Abstract

29th Linear Accelerator Cnference, LINAC18, Beijing, China, 17 Sep 2018 - 21 Sep 2018; Geneva : JACoW 20-24 (2018).<br />A future upgrade of the European XFEL (E-XFEL) foresees an additional CW operation mode, which will increase the flexibility in the photon beam time structure [1–3]. One of the challenges of this operational mode is the need fora CW operating photo injector. We believe that using an SRF gun is the preferred approach as the beam parameters of normal conducting pulsed guns can be potentially met by SRF guns operating CW. For more than a decade DESY, incollaboration with TJNAF, NCBJ, BNL, HZB and HZDR, has performed R&D to develop an all superconducting RFgun with a lead cathode. In the frame of E-XFEL CW upgrade feasibility studies, the SRF-gun R&D program gained more attention and support. Within the next few years we would like to demonstrate the performance of the all superconducting injector required for the E-XFEL upgrade. The selected approach offers advantages w.r.t. the cleanliness of the superconducting surface, but requires a complete disassembly of a cryostat and stripping the gun cavity in a cleanroom to exchange the cathode. Thus it is practical only when the life time of the cathode is at least several months. In this paper we present the actual status of the R&D program, next steps and the longer term plans.<br />Published by JACoW, Geneva

Details

Language :
English
Database :
OpenAIRE
Journal :
29th Linear Accelerator Conference-LINAC18, 16.-21.09.2018, Beijing, China, 29th Linear Accelerator Conference-LINAC18, 16.-21.09.2018, Beijing, ChinaProc. of 29th Linear Accelerator Conference-LINAC18, Genf: JACoW, Geneva : JACoW 20-24 (2018). doi:10.3204/PUBDB-2018-03813, 29th Linear Accelerator Conference, LINAC 2018, Beijing, China, 2018-09-17-2018-09-21
Accession number :
edsair.doi.dedup.....800f32774634a92e277c7281fef1bde8
Full Text :
https://doi.org/10.3204/PUBDB-2018-03813