A life-cycle analysis approach applied to the strengthening of the jarama steel bridge

Authors :
Sylvain Chataigner
Adélaïde Feraille
André Orcesi
Expérimentation et modélisation pour le génie civil et urbain (IFSTTAR/MAST/EMGCU)
Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)-Communauté Université Paris-Est
Laboratoire Navier (navier umr 8205)
Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)-École des Ponts ParisTech (ENPC)-Centre National de la Recherche Scientifique (CNRS)
Structures Métalliques et à Cables (IFSTTAR/MAST/SMC)
PRES Université Nantes Angers Le Mans (UNAM)-Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
EC/FP7//EU/Infravation - Fast and effective Solution for STeel bridges life-time extension/FASSTbridge
Cadic, Ifsttar
Source :
Scopus-Elsevier, 40th IABSE Symposium Tomorrow's Megastructures, 40th IABSE Symposium Tomorrow's Megastructures, Sep 2018, NANTES, France. 8 p

Abstract

40th IABSE Symposium Tomorrow's Megastructures, NANTES, FRANCE, 19-/09/2018 - 21/09/2018; This paper presents some results obtained in the Infravation research project called 'Fast and effective solution for steel bridges life-time extension' (FASSTbridge). The aim of this project is to develop and demonstrate a reliable, preventive, cost-effective and sustainable solution for steel bridges fatigue life-time extension. As a demonstration example, the Jarama Bridge was selected in this project. The Jarama bridge is located in the outskirts of the city of Madrid, over the river Jarama on road M-111, and has a total length of 115,5m and 5 spans (max span length 33,5m).Erected in the 1960s, it has suffered since then a considerable increase of traffic flow which was not considered at its design stage. This paper leads a cost-benefit analysis and a life cycle analysis of the CFRP solution compared with traditional techniques (use of steel plates) and considering the economic and environmental profit of the preventing policy. The aim is to adopt a preventive strategy to allow road administrations enlarging the service life of steel and composite steel bridges in a cost-effective and sustainable manner.

Details

Database :
OpenAIRE
Journal :
Scopus-Elsevier, 40th IABSE Symposium Tomorrow's Megastructures, 40th IABSE Symposium Tomorrow's Megastructures, Sep 2018, NANTES, France. 8 p
Accession number :
edsair.doi.dedup.....81db22beb2273607203b5b878644e11f