Back to Search
Start Over
The W-SEPT Project: Towards Semantic-Aware WCET Estimation
- Source :
- 17th International Workshop on Worst-Case Execution Time Analysis (WCET 2017), 17th International Workshop on Worst-Case Execution Time Analysis (WCET 2017), Jun 2017, Dubrovnik, Croatia. pp.13, ⟨10.4230/OASIcs.WCET.2017.9⟩
- Publication Year :
- 2017
- Publisher :
- HAL CCSD, 2017.
-
Abstract
- International audience; Critical embedded systems are generally composed of repetitive tasks that must meet hard timing constraints, such as termination deadlines. Providing an upper bound of the worst-case execution time (WCET) of such tasks at design time is necessary to guarantee the correctness of the system. In static WCET analysis, a main source of over-approximation comes from the complexity of the modern hardware platforms: their timing behavior tends to become more unpredictable because of features like caches, pipeline, branch prediction, etc. Another source of over-approximation comes from the software itself: WCET analysis may consider potential worst-cases executions that are actually infeasible, because of the semantics of the program or because they correspond to unrealistic inputs. The W-SEPT project, for “WCET, Semantics, Precision and Traceability”, has been carried out to study and exploit the influence of program semantics on the WCET estimation. This paper presents the results of this project : a semantic-aware WCET estimation workflow for high-level designed systems.
- Subjects :
- [INFO.INFO-AR]Computer Science [cs]/Hardware Architecture [cs.AR]
000 Computer science, knowledge, general works
Computer Science
0202 electrical engineering, electronic engineering, information engineering
Program analysis
020207 software engineering
02 engineering and technology
Worst-case execution time analysis
Static analysis
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Journal :
- 17th International Workshop on Worst-Case Execution Time Analysis (WCET 2017), 17th International Workshop on Worst-Case Execution Time Analysis (WCET 2017), Jun 2017, Dubrovnik, Croatia. pp.13, ⟨10.4230/OASIcs.WCET.2017.9⟩
- Accession number :
- edsair.doi.dedup.....92202cd6c524150d9e985aec66c8a7f1
- Full Text :
- https://doi.org/10.4230/OASIcs.WCET.2017.9⟩