Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction

Authors :
Si Qing Sheng
Fu Qiang Li
Xiao Hang Zhang
Wen Chao Zhang
Yan Pan
Yu Ou Hu
Source :
MATEC Web of Conferences, Vol 63, p 01039 (2016)
Publication Year :
2016
Publisher :
EDP Sciences, 2016.

Abstract

This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid.

Details

Language :
English
Volume :
63
Database :
OpenAIRE
Journal :
MATEC Web of Conferences
Accession number :
edsair.doi.dedup.....aa551b1d46e268ffff960c0865b548b2