Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
- Source :
- MATEC Web of Conferences, Vol 63, p 01039 (2016)
- Publication Year :
- 2016
- Publisher :
- EDP Sciences, 2016.
-
Abstract
- This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid.
- Subjects :
- Scheme (programming language)
Engineering
business.industry
Electrical engineering
Limiting
Network theory
Reliability engineering
Power (physics)
lcsh:TA1-2040
Stage (hydrology)
Power grid
Current (fluid)
business
lcsh:Engineering (General). Civil engineering (General)
computer
Three phase short circuit
computer.programming_language
Subjects
Details
- Language :
- English
- Volume :
- 63
- Database :
- OpenAIRE
- Journal :
- MATEC Web of Conferences
- Accession number :
- edsair.doi.dedup.....aa551b1d46e268ffff960c0865b548b2